Overhead is usually calculated:

a

tracking each indirect labor worker

b

estimating the cost using a rate

c

identifying the material waste not used in production

d

by knowing the direct product cost

+2
Answers (1)
  1. 6 January, 21:01
    0
    Estimating the cost using a rate

    Explanation:

    Overhead cost are the cost portion of a product that can re bot directly linked to a particular cost unit. In other words, overhead can be referred to as general expenses incurred in production.

    Going by its nature, its allocation to a unit of production is not direct and it involves a bit of analysis and calculation. therefore, one of the ways of calculating overhead is by estimating the cost using a rate
Know the Answer?
Not Sure About the Answer?
Find an answer to your question ✅ “Overhead is usually calculated: a tracking each indirect labor worker b estimating the cost using a rate c identifying the material waste ...” in 📘 Business if you're in doubt about the correctness of the answers or there's no answer, then try to use the smart search and find answers to the similar questions.
Search for Other Answers