This line consists of single-machine stations and is almost balanced (i. e. station rates are nearly equal). A manufacturing engineer has estimated the bottleneck rate of the line to be 1,000 fans per 20-hour day and the raw process time to be 50 minutes. The line has averaged 850 fans per 20-hour day, and the cycle time has averaged 2.8 hours. What would you estimate the WIP level to be

+1
Answers (1)
  1. 10 July, 01:47
    0
    119 fans

    Explanation:

    The computation of the estimated WIP is shown below:

    = Average fans per hour * average hours

    where,

    Average fans per hour is

    = 850 fans : 20 hours

    = 42.5 fans

    And, the average hours is 2.8

    So, the estimated WIP is

    = 42.5 * 2.8

    = 119 fans

    We assume we have to find out the average estimated WIP level
Know the Answer?
Not Sure About the Answer?
Find an answer to your question ✅ “This line consists of single-machine stations and is almost balanced (i. e. station rates are nearly equal). A manufacturing engineer has ...” in 📘 Business if you're in doubt about the correctness of the answers or there's no answer, then try to use the smart search and find answers to the similar questions.
Search for Other Answers