Connor Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on direct labor-hours. The company based its predetermined overhead rate for the current year on the following dа ta: Total direct labor-hours 78,000 Total fixed manufacturing overhead cost $ 460,200 Variable manufacturing overhead per direct labor-hour $ 5.00 Recently, Job P951 was completed with the following characteristics: Number of units in the job 50 Total direct labor-hours 100 Direct materials $ 710 Direct labor cost $ 7,800 The total job cost for Job P951 is closest to:

+3
Answers (1)
  1. 3 February, 18:43
    0
    Total cost = $9,600

    Explanation:

    Giving the following information:

    Total direct labor-hours 78,000

    Total fixed manufacturing overhead cost $ 460,200

    Variable manufacturing overhead per direct labor-hour $ 5.00

    Job P951:

    Total direct labor-hours 100

    Direct materials $ 710

    Direct labor cost $ 7,800

    First, we need to determine the estimated overhead rate:

    Estimated manufacturing overhead rate = total estimated overhead costs for the period / total amount of allocation base

    Estimated manufacturing overhead rate = (460,200/78,000) + 5 = $10.9 per direct labor hour.

    Now, we can calculate the total cost of the job:

    Total cost = 710 + 7,800 + (100*10.9)

    Total cost = $9,600
Know the Answer?
Not Sure About the Answer?
Find an answer to your question ✅ “Connor Corporation uses a job-order costing system with a single plantwide predetermined overhead rate based on direct labor-hours. The ...” in 📘 Business if you're in doubt about the correctness of the answers or there's no answer, then try to use the smart search and find answers to the similar questions.