Time, budget, and safety are almost always considered to be

1. Efficiency

2. Constraints

3. Trade-offs

4. Criteria

+4
Answers (2)
  1. 1 September, 05:18
    0
    The answer is option # 2. (Constraints).
  2. 1 September, 05:33
    0
    The answer is constraints
Know the Answer?
Not Sure About the Answer?
Find an answer to your question ✅ “Time, budget, and safety are almost always considered to be 1. Efficiency 2. Constraints 3. Trade-offs 4. Criteria ...” in 📘 Engineering if you're in doubt about the correctness of the answers or there's no answer, then try to use the smart search and find answers to the similar questions.