An american engineer who had been transferred to europe was asked to build bridge pilings exactly as he had in the united states. each piling required 20.0 cubic yards of concrete in the united states. how many cubic meters of concrete are required for each piling? given: 1 yd = 0.914 m.
+2
Answers (1)
Know the Answer?
Not Sure About the Answer?
Find an answer to your question ✅ “An american engineer who had been transferred to europe was asked to build bridge pilings exactly as he had in the united states. each ...” in 📘 Mathematics if you're in doubt about the correctness of the answers or there's no answer, then try to use the smart search and find answers to the similar questions.
Home » Mathematics » An american engineer who had been transferred to europe was asked to build bridge pilings exactly as he had in the united states. each piling required 20.0 cubic yards of concrete in the united states.