Solve the problem as directed. The time it takes to lay a sidewalk of a certain type varies directly as the length and inversely as the number of men working. If eight men take two days to lay 100 feet, how long will three men take to lay 150 feet?
+5
Answers (2)
Know the Answer?
Not Sure About the Answer?
Find an answer to your question ✅ “Solve the problem as directed. The time it takes to lay a sidewalk of a certain type varies directly as the length and inversely as the ...” in 📘 Mathematics if you're in doubt about the correctness of the answers or there's no answer, then try to use the smart search and find answers to the similar questions.
Home » Mathematics » Solve the problem as directed. The time it takes to lay a sidewalk of a certain type varies directly as the length and inversely as the number of men working. If eight men take two days to lay 100 feet, how long will three men take to lay 150 feet?