If a new sidewalk will be 5 feet wide, 100 feet long and filled to a depth of 9 inches (0.75 foot) with concrete how many cubic yards of concrete are needed

+2
Answers (1)
  1. 9 August, 12:45
    0
    (5 ft) * (100 ft) * (0.75 ft) * ((1 yd) / (3 ft)) ³ ≈ 13 8/9 yd³

    About 13.89 cubic yards of concrete are needed.
Know the Answer?
Not Sure About the Answer?
Find an answer to your question ✅ “If a new sidewalk will be 5 feet wide, 100 feet long and filled to a depth of 9 inches (0.75 foot) with concrete how many cubic yards of ...” in 📘 Mathematics if you're in doubt about the correctness of the answers or there's no answer, then try to use the smart search and find answers to the similar questions.