60% of the work is done in 17 minutes, 40% of the same work, when is done (in minutes) ?

+5
Answers (1)
  1. 21 April, 09:37
    0
    It would be 11.333 minutes

    Step-by-step explanation:

    I solved this by setting up a cross multiplication.

    60%/17 so then 40/x.

    Then here cross multiplying. 60x=680. divide by 60 and x would = 11.33