Ask Question
6 June, 12:56

A construction engineer needs to make sure a ceiling beam is Parallel to its corresponding floor beam. Using the drawing as a guide, which part of the measurements are sufficient to show the beams are parallel

+2
Answers (1)
  1. 6 June, 14:14
    0
    Answer:221121
Know the Answer?
Not Sure About the Answer?
Find an answer to your question ✅ “A construction engineer needs to make sure a ceiling beam is Parallel to its corresponding floor beam. Using the drawing as a guide, which ...” in 📘 Mathematics if you're in doubt about the correctness of the answers or there's no answer, then try to use the smart search and find answers to the similar questions.
Search for Other Answers