A bicycle shop repaired 40 bicycles in 8 days.

What was the rate of work?

A.

B.

C.

D.

+1
Answers (2)
  1. 17 June, 05:33
    0
    40:8 = 5

    they repaired on average 5 bikes per day
  2. 17 June, 06:13
    0
    The bike shop repairs 40/8=5 bicycles per day, on average.