James needs 50 tons of dirt for a large construction project. He already has 3 tons of dirt at the construction site. Each dump truck can transport 8 tons of dirt. How many trips does the dump truck need to take to reach 50 tons of dirt?
A.
5
B.
6
C.
7
D.
8
+2
Answers (1)
Know the Answer?
Not Sure About the Answer?
Find an answer to your question ✅ “James needs 50 tons of dirt for a large construction project. He already has 3 tons of dirt at the construction site. Each dump truck can ...” in 📘 Mathematics if you're in doubt about the correctness of the answers or there's no answer, then try to use the smart search and find answers to the similar questions.
Home » Mathematics » James needs 50 tons of dirt for a large construction project. He already has 3 tons of dirt at the construction site. Each dump truck can transport 8 tons of dirt. How many trips does the dump truck need to take to reach 50 tons of dirt? A. 5 B. 6 C.