Tiles (6" by 6") can be installed at the rate of 50 per worker hour. The floor of a large lobby area (80' by 40') is to be covered with these tiles. If three workers are assigned to this task, what duration (to the nearest whole day) should be assigned to this activity?

+3
Answers (1)
  1. 25 March, 01:35
    0
    Step-by-step explanation:

    Tiles (6" by 6") can be installed at the rate of 50 per worker hour. Since the tile is a square, its area is

    L^2 = 6^2 = 36 inches square

    So in an hour, a worker installs 50 tiles whose area is 36 inches square. Total square meters installed per hour will be 50 * 36 = 1800 inches square per hour.

    If three workers are assigned to this task, their work rate will be

    1800 * 3 = 5400 inches square per hour.

    The floor of a large lobby area (80' by 40') is to be covered with these tiles. We would convert from feet to inches.

    1 foot = 12 inches

    80 feet = 80 * 12 = 960 inches

    40 feet = 40 * 12 = 480 inches

    Area of the lobby = 90 * 480 = 460800 inches square.

    If the 3 workers install 5400 inches square in 1 hour,

    Then then they will install 460800 inches square in

    460800/5400 = 85.33 hours

    Converting to the nearest whole day, it becomes

    85.33/24 = 3.55

    Approximately 4 days
Know the Answer?
Not Sure About the Answer?
Find an answer to your question ✅ “Tiles (6" by 6") can be installed at the rate of 50 per worker hour. The floor of a large lobby area (80' by 40') is to be covered with ...” in 📘 Mathematics if you're in doubt about the correctness of the answers or there's no answer, then try to use the smart search and find answers to the similar questions.