Ask Question
4 October, 20:38

Hannah has some scraps of ribbon measuring 3.52 meters, 17.3 meters and 27.009 meters. Does she have enough to do a project requiring 50 meters of ribbon? If yes, how much ribbon will she have left? If no, how much more ribbon does she need?

+1
Answers (1)
  1. 4 October, 22:36
    0
    No, 2.171m.

    Step-by-step explanation:

    Add all of measurements. 3.52+17.3+27.009=47.829

    Compare 2 numbers.

    47.829<50

    So she needs more ribbon, because the length she has is less the requirement, 50m.

    Find the difference (the length she needs).

    50-47.829=2.171
Know the Answer?
Not Sure About the Answer?
Find an answer to your question ✅ “Hannah has some scraps of ribbon measuring 3.52 meters, 17.3 meters and 27.009 meters. Does she have enough to do a project requiring 50 ...” in 📘 Mathematics if you're in doubt about the correctness of the answers or there's no answer, then try to use the smart search and find answers to the similar questions.
Search for Other Answers