Ask Question
18 May, 08:43

the sum of the speeds of two trains is 720.2 mph. if the speed of the first train is 7.8 mph faster than the second train, find the speeds of each.

+3
Answers (1)
  1. 18 May, 10:10
    0
    Answer: 1st train = 364 mph, 2nd train = 356.2

    Step-by-step explanation:

    Train 1: x + 7.8

    Train 2: x

    Train 1 + Train 2 = Sum

    x + 7.8 + x = 720.2

    7.8 + 2x = 720.2

    2x = 712.4

    x = 356.2

    Train 1: x + 7.8

    = 356.2 + 7.8

    = 364
Know the Answer?
Not Sure About the Answer?
Find an answer to your question ✅ “the sum of the speeds of two trains is 720.2 mph. if the speed of the first train is 7.8 mph faster than the second train, find the speeds ...” in 📘 Mathematics if you're in doubt about the correctness of the answers or there's no answer, then try to use the smart search and find answers to the similar questions.
Search for Other Answers