    Given: Mass m = 290 Kg; Height h = 7 m

    Required: Work = ?

    Formula: Work = Force x distance but, Force F = mg

    W = fd

    W = mgh

    W = (290 Kg) (9.8 m/s²) (7 m)

    W = 19,894 Kg. m²/s²

    W = 19,894 J