Ask Question
16 February, 01:29

A 5.00-kg block of ice is sliding across a frozen pond at 2.00 m/s. A 7.60-N force is applied in the direction of motion. After the ice block slides 15.0 m, the force is removed. The work done by the applied force isA 5.00-kg block of ice is sliding across a frozen pond at 2.00 m/s. A 7.60-N force is applied in the direction of motion. After the ice block slides 15.0 m, the force is removed. The work done by the applied force is

+5
Answers (1)
  1. 16 February, 02:46
    0
    work done by applied force

    = force x displacement

    = 7.6 x 15 m

    = 114 J.
Know the Answer?
Not Sure About the Answer?
Find an answer to your question ✅ “A 5.00-kg block of ice is sliding across a frozen pond at 2.00 m/s. A 7.60-N force is applied in the direction of motion. After the ice ...” in 📘 Physics if you're in doubt about the correctness of the answers or there's no answer, then try to use the smart search and find answers to the similar questions.
Search for Other Answers