22 December, 17:26

A 1300 kg elevator is lifted at a constant speed of 1.3 m/s through a height of 22 m. How much work is done (a) by the tension in the elevator cable and (b) by gravity?

+4
Answers (1)
  1. 22 December, 21:08
    0
    Wc = mgd = 280 kj

    Wg = mgd = - 280 kJ
Know the Answer?
Not Sure About the Answer?
Find an answer to your question ✅ “A 1300 kg elevator is lifted at a constant speed of 1.3 m/s through a height of 22 m. How much work is done (a) by the tension in the ...” in 📘 Physics if you're in doubt about the correctness of the answers or there's no answer, then try to use the smart search and find answers to the similar questions.